Staff reported 409 of 1,500 wells registered. Wells unregistered by October 31 will not have 2027 dashboard allocations loaded; no allocation-volume change was announced. Workplan updates covered groundwater quality, interconnected surface-water monitoring and subsidence. The three Kaweah GSAs are reviewing a supplemental supply framework. The board accepted financials ($3.05 million in bank accounts; $489,969 year-to-date net income) and adopted Resolution No. 2026-04.
The board approved switching to a single-invoice billing system for the emergency ordinance, reducing manual steps since most landowners accept the tiered water allocation. Staff updated the board on four well mitigation cases and a possible proactive re-drill incentive to reduce interim supply costs. Staff reported the Greater Kaweah stakeholder committee recommended replacing overdraft allocation with a supplemental supply allocation.
Staff reported progress in subsidence talks with DWR, including DWR's reaction to modeling that could show subsidence after 2040. The board approved a semi-annual cost-sharing invoice totaling about $688,000, split three ways (~$230,000 each). Staff said the State Water Board is expected to release a Phase Two scientific basis report Aug. 18 on Sacramento-Delta flows affecting surface water and recharge.
Water Year 2027 groundwater allocations remain unchanged at 9 inches tiered and 10 inches native yield, though staff flagged drier conditions and potential supply stress in 2030–2033. A $550K groundwater model update scope/budget was approved (MKGSA share stated as ~$183K under an equal cost-share arrangement) targeted for spring next year to produce outputs ahead of WY2028 allocations. Well registration remains behind at 358 of ~1,300 wells; staff expects a revised strategy within 30 days.
Well registration is now mandatory, with staff available to assist growers on-site during an outreach push expected this fall. The board approved a new Dedicated Recharge Basin Policy with embankment and verification requirements; staff said earlier applicants do not need to reapply and remain under review. Predictive modeling to inform a steady-state allocation for water year 2028 was cited as a top priority.