Lower Tule River Irrigation District

Upgrate to Platform Plan to see more details. Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Allocation

2026 Total allocation: 1.87 af/ac - Precipitation Yield: 0.76 af/ac [can be reused when cover crops are not consuming water as measured by ET, capped at 0.96 af]
Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Allocation Documents

Allocation Base Rules

Other Document

Helpful Link

October 13, 2026

Staff outlined pumping-based groundwater accounting for October 2027 and a possible January 2027 subsidence order; no 2027 allocation change was approved. Canal urgency-plan talks remained unresolved, with a state two-mile moratorium still only proposed. The board tabled the fallowing-policy change, approved the 2027 budget and authorized up to $500,000 in emergency channel work.

Loading...
Read more →
September 8, 2026

Staff said the State Water Board's interim plan could impose pumping moratoriums near the Friant-Kern Canal, with a draft expected in January and possible action in April; staff discussed aiming for late October or early November to present a local alternative to Friant. Staff reviewed a potential 2027 shift to pump-based accounting; no action was taken and specifics are expected in October. The fallowing precipitation-credit policy item was tabled for refinement.

Loading...
Read more →
August 11, 2026

Staff said the State Water Board is accelerating its interim plan timeline, with potential adoption in Jan–Feb 2027, including a possible pumping moratorium within about two miles of the Friant-Kern Canal. Staff discussed a potential shift from ET/consumption-based accounting to pumping-based tracking and warned growers that SWRCB fee invoices are arriving with a 30-day deadline.

Loading...
Read more →
July 15, 2026

The board approved a $165/acre assessment rate for 2026-2027, below the staff-recommended maximum of ~$180.33. Staff discussed rising subsidence risk and a possible tiered upper/lower aquifer allocation framework, with recommendations targeted by this fall. The SWRCB interim plan timeline was discussed: potential adoption by July 2027 with effect in 2028, adding uncertainty around local pumping management.

Loading...
Read more →
June 29, 2026

Subsidence is accelerating across management zones, with one monitored lower-aquifer site about 70 feet below its minimum threshold (MT) as the primary driver. Staff estimated pumping reductions of 0.6–0.9 acre-feet per acre in SMZ 35 could help recover levels, with flood irrigators facing the largest impact. Staff said they will develop possible pumping-cap and allocation change options for next year and return with options in July–August.

Loading...
Read more →